skip to navigation skip to content skip to footer

Defence Infrastructure Division

Larrakeyah Barracks Redevelopment Project


Project Element 7: Upgrade ICT Infrastructure

The proposed upgrading of the ICT infrastructure will feature a new ICT Core Node building, which is then connected via a new fibre based infrastructure to the various buildings on the precinct. The existing pit and conduit system will be upgraded to accommodate the new cabling and to provide capacity for growth, as shown in figure 10 below.

Proposed Armament Wharf Extension
Figure 10: Upgrade ICT Infrastructure