skip to navigation skip to content skip to footer

Defence Infrastructure Division

Larrakeyah Barracks Redevelopment Project


Project Element 4: Upgrade the Fire Fighting Infrastructure

The proposed new fire fighting water supply includes dedicated fire water main, pumps water storage tanks and fire brigade suction boosters, as shown in figure 7 below.

Proposed Armament Wharf Extension
Figure 7: Upgrade Fire Fighting Infrastructure