Facilities To Support Naval Operation Project


HMAS Coonawarra Works

Project Element 1: New Wharf

The proposed new Wharf in figure 14 below, is 250 metres long with the width of the deck width of 25 metres, as demonstrated in figure 14 below. Two berthing dolphins and a mooring dolphin will be constructed to the north of the proposed wharf structure.

The wharf will be a piled structure with a quay line nominally 55 metres from the shoreline with 32 metres and 42 metres long approach bridges spanning between the wharf and the proposed hardstand.

Proposed Armament Wharf Extension
Figure 14: Proposed New Wharf