RIMPAC 2008
18 July 2008 HMAS ANZAC is the first of her class and a modern warship, capable of operating in a multi-threat environment. ANZAC’s design is based on the German Meko 200 Class that uses modular construction methods. ANZAC is fitted with an advanced package of air surveillance radars; hull mounted sonar and electronic support systems that interface with state-of-the-art weapons systems. ANZAC’s armament comprises a five-inch gun, Harpoon missiles, Evolved Sea Sparrow Missiles (ESSM) and ship launched Torpedoes. Multi-role Sikorsky S-70B-2 Seahawk helicopters can be embarked to enhance anti-submarine and anti-surface warfare capabilities. ANZAC is the third Royal Australian Navy ship to carry the name of an Australian legend. |
|
20080709adf8185016_0010 |
![]() |
20080709adf8185016_0012 |
![]() |
20080709adf8185016_0019 |
![]() |
| 20080709adf8185016_0023 HMAS ANZAC pulls along side HMAS SUCCESS for a replenishment at sea task during Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 11 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0034 Leading Seaman Steward, Brian Cherry watches on as HMAS ANZAC pulls along side HMAS SUCCESS for a replenishment at sea task during Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 11 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0051 Sailors from HMAS ANZAC haul in a guide line from HMAS SUCCESS prior to hooking up for a replenishment at sea task during Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 11 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0068 Leading Seaman Boatswains Mate Dave Ryan (right) from HMAS ANZAC gives the order for the line handling team to avast during a replenishment at sea task with HMAS SUCCESS as part of Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 09 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0088 HMAS ANZAC along side HMAS SUCCESS during a replenishment at sea task, as part of Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 09 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0103 Leading Seaman Steward Brian Cherry holds the line as HMAS ANZAC completes a replenishment at sea operation with HMAS SUCCESS as part of Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 09 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0104 Leading Seaman Electronics Technician Lees, from HMAS ANZAC holds the line as ANZAC completes a replenishment at sea operation with HMAS SUCCESS as part of Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 09 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0117 As the USS CHUNG HOON approaches HMAS SUCCESS, Sub Lieutenant Will Hartridge (right) watches on as HMAS ANZAC completes a replenishment at sea task as part of Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 09 July 2008) low-res | high-res |
![]() |
| 20080709adf8185016_0121 Leading Seaman Naval Stores Graeme Cant from HMAS ANZAC makes a signal to the crew of HMAS SUCCESS during a replenishment at sea task as part of Exercise Rim of the Pacific (RIMPAC) 2008. (Date taken: 09 July 2008) low-res | high-res |
![]() |












