SBC Step 1d - Conduct Risk Management Workshop(s)
Activity Considerations Outcome

1) Consultant and relevant Project staff are to conduct a Risk Management Workshop with the SBC stakeholders.

2) Determine appropriate options – the consultant in conjunction with the relevant Project staff develop the preliminary options.

     

  • Previous risks and options identified at Step 2 should be revisited
  • Project Risk Tool to be utilised for the risk assessment - this tool is located within DEMS.
  • User requirements
    • Functions
    • People
  • Technical requirements
  • NPOC aspects
  • CSIR Part 2
  • Defence Green Building Requirements - Refer to Section 5.2 ESD Performance Targets and Requirements and Green Building Toolbox - Refer to Checklist and Budget Costing for SBC
  • Project risk assessment summary generated from DEMS and attached to the SBC.
  • Appropriate options identified and developed.