Defence Estate Quality Management System (DEQMS) - IM |
Budget Year 2 - DEMS Project Instructions
|
| Outcome: Project details are recorded in DEMS, including the risk assessment and CSIR attached to the project. |
| Field By Field Instructions |
| Project Details tab Project Name – can be copied directly from the CSIR. The naming convention is Location/Establishment – Facility/Unit –Activity”, where
Eg RBW – Bldg 392 & 393 LIA - CF3, P3 Flooring and Painting Repairs (for project at RAAF Base Wagga consisting of repairs to identified training facilities, all of which have a common contribution factor or 3 and priority of P3 “asset preservation”). Note that DEMS restricts the character length to 64 characters. Product Type - Selected from the Product Type drop down box and paired with Project Type, see table below: Project Type – Use to categorise the nature of the works. Project Type and Product Type pairings are used to determine the funding category in the approval process. Project Type is also used for the in-year program management process using the Program Status Report and the Allocation Variation Advice (AVA). |
Product Type |
Project Type |
Comment |
Applicable Cost Element(s) |
CMS |
Annual Fees/Levies |
Fees paid to third parties, typically municipal councils for maintenance on roads of access. |
21539 |
CMS |
CMC/CMS Management Fees |
Project Type not used |
21537 |
CMS |
FP&E Reactive Maintenance |
Reimbursable FP&E reactive maintenance. |
21543 |
CMS |
GEW Reactive Maintenance |
Immediate and urgent reactive maintenance through the Property Service Centre. |
21542 |
CMS |
GEW Routine Maintenance |
Non-urgent reactive maintenance through the Property Service Centre. |
21541 |
CMS |
Hire of Facilities (Short Term) |
Short term hire of facilities (limited application). |
21559 |
Risk Managed Works |
Work Planning Fees |
Used for consultancies for scoping future works, includes infrastructure appraisals, environmental planning and heritage management planning. For 09/10 onwards, Work Planning Fees are to be managed in the same way as Risk Managed Works projects. |
21538 |
Risk Managed Works |
Asbestos * |
Works where the majority of expenditure is for management of asbestos. |
21573 and/or CAPITAL# |
Risk Managed Works |
Demolition Works * |
Works where the majority of expenditure is demolition. |
21544 and/or CAPITAL# |
Risk Managed Works |
Devolved DMO |
Devolved projects funded by DMO. |
21544 and/or CAPITAL |
Risk Managed Works |
Devolved Funded |
Devolved projects once the funding has been transferred. |
21544 and/or CAPITAL |
Risk Managed Works |
Devolved Unfunded |
Devolved projects where the funding is yet to be transferred. |
21544 and/or CAPITAL |
Risk Managed Works |
Energy & Water Efficiency |
Energy, sustainability and water efficiency works. |
21544 and/or CAPITAL# |
Risk Managed Works |
Environmental Management * |
Environmental works including monitoring and pollution prevention works. |
21544 and/or CAPITAL# |
Risk Managed Works |
FP&E Replacement * |
All bids for FP&E replacement are to include a completed business case, agreed by the contract administrator. |
21544 and/or CAPITAL# |
Risk Managed Works |
Heritage Management * |
Heritage management works. |
21544 and/or CAPITAL# |
Risk Managed Works |
Maintenance Works * |
All planned asset prevention and end of life replacement maintenance works. If the replacement is like for like, it should be bid as expense, 21544 and therefore not subject to the $500K limit. If the replacement is motivated by a requirement for a material change to the capability/capacity of the FP&E, it should be bid as CAPITAL and is subject to the $500K limit. |
21544 and/or CAPITAL# |
Risk Managed Works |
Minor New Works |
Changes to estate capability up to a limit of $500K CAPITAL component. Bids can exceed $500K provided the CAPITAL component is under $500K. |
21544 and/or CAPITAL# |
Risk Managed Works |
Non Single LEAP LIA |
Living In Accommodation works not funded by the Single LEAP program. |
21544 and/or CAPITAL# |
Devolved |
|
No longer used |
|
GSS |
|
Not used in Estate Maintenance bidding |
|
These works of a maintenance nature are to be identified in the infrastructure appraisal process and documented in the IA Maintenance Plan for the base. # The CAPITAL component of Estate Maintenance bids is not to exceed $500K. NPOC Impact - Check the NPOC Impact checkbox if the CSIR contains NPOC details. Beneficiary - Selected from the Sponsor drop down box. The choices are
MS Manager - Selected from the DEMS User accounts list, this is the CMS Project Manager responsible for the delivery of this project. DS Officer - Selected from the DEMS User accounts list, this is the DS officer who will be looking after the delivery of this project. For fees type projects, this should be the contractor administrator or equivalent delegate. Client Contact – POC in the occupant’s organisation for this project. Cost Estimate and Financial Category - Estate Maintenance Cost Estimates should be entered into the Financial Allocations area of the details screen. The split between Expense amount (enter cost element code in Cost Element, usually 21544) and Capital (select CAPITAL in Cost Element) amount is to be entered. GST inclusive figures are to be used. Attached Documents tab Attached Works tab Risk Managed Works tab Estate Risk tab All other information on the CSIR need not be copied to DEMS at this time. |