Defence Estate Quality Management System (DEQMS) - IM |
| Site Navigation :: Home>Site Selection Process>Fill in the Considerations Matrix |
|
Site
Selection REGIONAL REVIEW Step 7 - Fill
in the Considerations Matrix |
||
| Activity | Considerations | Outcome |
|
1) Regional Project Officer (RPO) or delegated Project Contractor fills in the Considerations Matrix in consultation with identified subject matter experts.
|
As the name suggests, the Considerations Matrix is a comprehensive list of potential risks, or issues that are to be considered for each siting option. The aim is to assist in establishing the suitability of each siting option with respect to the various aspects of the project. It is not anticipated that all listed considerations will necessarily be relevant to all of the siting options. The filling out of the Considerations Matrix is the responsibility of the Regional Project Officer, however the Project Contractor may assist with this process. The RPO or delegated Project Contractor is expected to have the requisite technical expertise to decide which considerations are likely to be of relevanceand to complete the information requested as far as practicable. Where uncertainty exists as to the relevance of a consideration, subject matter experts (SME) should be contacted for guidance and to assist in filling in the required information. It is not necessary to contact an SME if a consideration is clearly not relevant to a potential siting option. A subject matter expert for each consideration in the Considerations Matrix is listed below. |
The Considerations Matrix is completed for each siting option.
|
Consideration
|
Subject Matter Expert |
|
Tab 1 Technical Considerations Relating to Airfields and Aviation Activities |
|
|
Obstruction Clearance Surfaces |
Land
Planning and Spatial Information (DLPSI) |
| Obstruction Lighting and Marking Requirements | Land Planning and
Spatial Information (LPSI) |
| Air Traffic Control (ATC) Tower/Fire Station Line of Sight | Senior Air Traffic Controller (SATCO) |
| Exhaust Plumes | Land
Planning and Spatial Information (LPSI) Contact: EO LUP Gary Lee Ph: 02-62668187 Email: gary.lee1@defence.gov.au |
| Aircraft Noise | Land
Planning and Spatial Information (LPSI) Contact: AD External Land Use Planning Ph: 02-62668359 Email: matthew.dopson@defence.gov.au |
| Environmental Considerations | Regional Environmental Officer (REO) |
|
Tab
2 Electromagnetic Radiation and Noise Considerations
|
|
|
Electromagnetic Radiation
|
Directorate of Estate Maintenance Policy |
|
Directorate of Ordnance Safety Land Engineering Agency |
|
Ground
Telecommunications Equipment Systems Project Office (GTESPO) Contact: Noel Marriot Ph: 02-49645561 E-mail: noel.marriott@defence.gov.au |
|
Regional
Occupational Health & Safety Manager (ROHSM or ROHSCO) and Directorate of Radiation Hazard Management Contact: Kevin Brett Ph:02-62662769 E-mail: kevin.brett@defence.gov.au |
| Noise and Vibration | Land Planning and
Spatial Information (LPSI) |
|
Tab
3 Master Planning Considerations |
|
| Internal (on base) Considerations |
Land Planning and Spatial Information (LPSI) Zone Planning and Master Planning |
|
Tab
4 Environment and Heritage Considerations |
|
| Environment and Heritage | Regional Environmental Officer (REO) Estate Policy & Environment Branch |
|
Tab
5 Engineering Considerations |
|
|
Location and Capacity of Hydraulic Services |
|
| Base Services Manager (BSM) |
| Base Services Manager (BSM) |
| Base Services Manager (BSM) |
| Base Services Manager (BSM) |
| Regional Information Communication Technology Manager (RICTM) |
|
Directorate
of Estate Engineering Policy (DEEP) Contact: TBA |
|
Tab
6 Design Traffic and Property Considerations |
|
|
Directorate
of Estate Engineering Policy (DEEP) Contact: SQNLDR Dave Alder Ph: 02-62668183 E-mail: david.alder@defence.gov.au |
|
Base Services Manager (BSM) Base Services Manager (BSM) |
|
Tab
7 Security and Safety Considerations |
|
|
Regional Security Manager/SADFO and BSM |
|
Base
Armaments Manager (BAM) Directorate of Explosive Ordnance Services (DEOS) Directorate
of Estate Engineering Policy (DEEP) |
|
Regional