Site
Selection REGIONAL REVIEW Step 7 - Fill
in the Considerations Matrix |
||
| Activity | Considerations | Outcome |
|
1) Regional Project Officer (RPO) or delegated Project Contractor fills in the Considerations Matrix in consultation with identified regional and technical authorities.
|
As the name suggests, the Considerations Matrix is a comprehensive list of potential risks, or issues that are to be considered for each siting option. The aim is to assist in establishing the suitability of each siting option with respect to the various aspects of the project. It is not anticipated that all listed considerations will necessarily be relevant to all of the siting options. The filling out of the Matrix is the responsibility of the Regional Project Officer however the Project Contractor may assist with this process. The RPO or delegated contractor is expected to have the requisite technical expertise to decide which considerations are likely to be of relevance. Where uncertainty exists as to the relevance of a consideration, Regional and Technical Authorities should be contacted for guidance. It is not necessary to contact an authority if a consideration is clearly not relevant to a potential siting option. When filling in the Matrix the RPO or contractor should include the name of the authority providing the advice and the date. N.B. Activity 1 in Step 8 is only required if the RPO or contractor has not consulted a regional or technical authority in completing a relevant consideration. An authority point of contact for each consideration in the Matrix is listed below. |
The Considerations Matrix is completed for each siting option.
|
Consideration
|
Regional
and Technical Authority |
|
Tab 1 Technical Considerations Relating to Airfields and Aviation Activities |
|
|
Obstruction Clearance Surfaces |
Land
Planning and Spatial Information (DLPSI) |
|
Obstruction Lighting and Marking Requirements |
Land Planning and
Spatial Information (LPSI) |
|
Air Traffic Control (ATC) Tower/Fire Station Line of Sight |
Base Commander |
|
Exhaust Plumes |
Land
Planning and Spatial Information (LPSI) |
|
Aircraft Noise |
Land
Planning and Spatial Information (LPSI) |
|
Environmental Considerations |
Regional Environmental Officer (REO) |
|
Tab
2 Electromagnetic Radiation and Noise Considerations
|
|
|
Electromagnetic Radiation
|
|
|
Guided Weapons Explosive Ordnance Branch Contact: Barry Lock E-mail: barry.lock@defence.gov.au |
|
Ground
Telecommunications Equipment Systems Project Office (GTESPO) Contact: Noel Marriot Ph: 02-49645561 E-mail: noel.marriott@defence.gov.au |
|
Regional
Occupational Health & Safety Manager (ROHSM or ROHSCO) and Occupational Health Safety & Conditions Branch (OHSC) Contact: Kevin Brett Ph:02-61272012 E-mail: kevin.brett@defence.gov.au |
|
Noise and Vibration |
Land Planning and
Spatial Information (LPSI) |
|
Tab
3 Master Planning Considerations |
|
| Internal Considerations |
Land Planning and Spatial Information (LPSI) NSW/ACT/SA/VIC/NT-K/WA/QLD/TAS |
| Master Plan |
Land
Planning and Spatial Information (LPSI) |
|
Tab
4 Environment and Heritage Considerations |
|
| Environment and Heritage | Regional Environmental Officer (REO) Estate Policy & Environment Branch |
|
Tab
5 Engineering Considerations |
|
|
Location and Capacity of Hydraulic Services
|
|
|
Directorate
of Estate Engineering Policy (DEEP) Contact: TBA |
|
Tab
6 Design Traffic and Property Considerations |
|
|
Directorate
of Estate Engineering Policy (DEEP) |
|
Regional
Development Manager (RDM) Regional Development Manager (RDM) |
|
Tab
7 Security and Safety Considerations |
|
|
Regional Security Manager/Base Commander |
|
Base Armaments Manager (BAM) Directorate of Explosive Ordnance Services (DEOS) Directorate
of Estate Engineering Policy (DEEP) |
|
Regional
Occupational Health & Safety Manager Occupational
Health Safety & Conditions Branch (OHSC) |