skip to navigation skip to content skip to footer

Defence Infrastructure Division

Stage One of the Garden Island (East) Critical Infrastructure Recovery Program

Project Element 3: Seabed Dredging

It is proposed that the existing seabed surrounding the new realigned wharf will be dredged to increase its depth as per Figure 4.

Vehicle Weighbridge

Figure 4: Proposed Seabed Dredging