skip to navigation skip to content skip to footer

Defence Infrastructure Division

Stage One of the Garden Island (East) Critical Infrastructure Recovery Program

Project Element 2: Construction of Wharf Structures

It is proposed that a new wharf structure be built in a revised alignment in place of the existing Cruiser Wharf and Oil Wharf once demolished. It is also proposed to extend the adjoining East Dock Wharf to limit the new realigned wharf's protrusion as demonstrated in Figure 3.

Vehicle Weighbridge

Figure 3: Proposed Wharf Construction Footprint