skip to navigation skip to content skip to footer

Defence Infrastructure Division

Stage One of the Garden Island (East) Critical Infrastructure Recovery Program

Project Element 1: Demolition of Wharf Structures

It is proposed that the existing Cruiser Wharf and Oil Wharf structures be demolished. This includes removing all existing wharf furniture and shore engineering services as well as the portal crane. The extent of the proposed demolition works is demonstrated in Figure 2 below.

Vehicle Workshop

Figure 2: Extent of the Proposed Demolition Works