skip to navigation skip to content skip to footer

Defence Infrastructure Division

LAND 155 - ENHANCED GAP CROSSING CAPABILITY FACILITIES PROJECT

Wallangarra Proposed Works

The proposed LAND 155 Enhanced Gap Crossing Capability facilities to be delivered at Wallangarra include the following:

  1. Shelter for critical bridging assets;
  2. Hardstand for non-critical bridging equipment;
  3. Security fencing to the new compound; and
  4. Pavement upgrade to allow for vehicles access off existing road network.

Vehicle Workshop

SHELTER AND HARDSTAND
(Image is an artist impression for indicative use only)

Please refer to Drawings - Wallangarra Works for the location and site layout for this project element.