Defence Materiel Organisation banner edge
Defence Links
banner edge
Department Air Force Army Navy Minister
banner edge
Advanced Search banner edge


Display Printer Friendly Version

Projects

LAND 125 Soldier Combat System: Phase 3C Lethality

Project Overview

Land 125 is a multi-phase combat ensemble project that aims to deliver successive enhancements to the Soldier Combat System and is responsible for the acquisition of capabilities for the dismounted close combat force. Capabilities are integrated through a spiral development plan that allows for incremental acquisition.

It is providing enhancements to the NATO-defined and inter-related soldier sub-systems of Lethality, Survivability, Sustainment and Mobility, and Command, Control Communications, Computer and Information.

The combination of individual combatants, their units and the interfaces with the internal and external battle environment is termed the Soldier Combat System.

Land 125 Phases

The project has been split over a number of DMO divisions.
Phase 3 received Government First Pass approval in May 2005. Phase 3 of the project was then divided into three distinct sub-phases:

Phase 4 - Soldier System Integration (responsibility with Integrated Soldier Systems Development Directorate, Land Systems Division).

Phase 3C - Lethality

Investigation is underway to enhance the in-service F88 Steyr rifle. The enhanced F88 will be a modular rifle system to provide physical integration with improved performance and handling, including the integration of ancillary devices such as sights to the weapons. These modifications will enhance the lethality of the individual soldier, fire team and section.

Point of Contact

TOP
click on image to enlarge
1 RAR soldier equipped with the developmental test bed equipment from which Soldier Enhancement Version One capabilities were developed

LAND 125 Soldier Combat System
Armament Systems Program Office
Integrated Soldier Systems Branch
Land Systems Division
Defence Materiel Organisation
Victoria Barracks Melbourne
256-310 St Kilda Road
SOUTHBANK VIC 3006
Australia

Phase 3C Project Manager:
Telephone: +61 3 9282 4409
Facsimile:   +61 3 9282 4376

Last updated: February 2013

banner head

Publications

Future Submarine Industry Skills Plan Future Submarine Industry Skills Plan
Introducing the Defence Materiel Organisation Introducing the DMO - August 2013 Update
Portfolio Budget Statements 2011-12 Portfolio Budget Statement 2013-2014
 2012 Public Defence Capability Plan 2012 Public Defence Capability Plan
Defence Annual Report 11-12 Defence Annual Report 12-13
Defence Annual Report 2011-12 DMO Major Projects Report 2012-13
Defence Industry Policy Statement 2010 Defence Industry Policy Statement 2010
Defence Procurement Policy Manual Defence Procurement Policy Manual
Coles Review Coles Review