JP 90

Phase 1 ADF Identification Friend or Foe

Phase Scope

This project aims to update ADF platforms to comply with the Mark XIIA Identification Friend or Foe (IFF)standard. The project intends to focus on platforms that have an existing Mode 4 capability and newly delivered platforms which may not be Mode 5 compliant. In parallel with this project AIR 5432 is being developed in response to the plans for Australian adoption of Automatic Dependent Surveillance – Broadcast (ADS-B) for surveillance of en route air traffic (Mode S).

Background

The US and NATO nations have agreed to adopt the Mark XIIA standard by 2019. The IFF Mode 5 waveform, included in the Mark XIIA family, is the means through which sea and air platforms verify their identity to interrogating platforms.

Australian Industry Opportunities

Acquisition

It is expected that industry will focus on aspects that include:

  • participation in and contribution to Project Development Studies (PDS) conducted by subject matter experts within Australian industry;
  • design and development of any relevant support systems; and
  • development and integration of Mode 5 IFF systems into ADF aircraft, ships and ground based units.
Through‑life Support

Full through-life support is needed and more specific requirements are to be determined by the PDS for each type of equipment identified. Specific support arrangements are to be assessed on a case-by-case basis as purchasing occurs.

Industry Capabilities and Activities

Capabilities and related activities that may provide opportunities for Australian industry in this phase include:

Activity Capability
Communication Systems (Air Traffic Control – IFF Modes)
Assemble / Install D
Design D
Project Manage D
Systems Integration D
Test and Evaluate D
Acquisition Category (ACAT)
ACAT Attribute Complexity Level Assessment
Acquisition Cost Level 3 Moderate $100m–$500m (Towards the middle of the band)
Project Management Complexity Level 3 Moderate
Schedule Level 3 Moderate
Technical Difficulty Level 3 Moderate
Operation and Support Level 3 Moderate
Commercial Level 3 Moderate

The ACAT Level assessed for this Phase is ACAT III.

Planned Schedule Highlights

First Pass Approval

FY 2011-12 to FY 2012-13

Year-of-Decision

FY 2013-14 to FY 2015-16

Initial Operating Capability

2016 to 2018

Points of Contact

Capability Staff:

Staff Officer Battlespace

Management 2

(02) 6265 7530

Defence Materiel Organisation:

Navigation Warfare Engineer 1

Navigation Warfare Systems Program Office

(02) 6265 7798

Defence Capability Plan / 2009 / Public Version