The table below shows changes made to the Public DCP 2009 projects as at 31 December 2009 including First Pass Approvals.
| Proposal Number | Phase | Description |
|---|---|---|
| AIR 5416 | 4B2 | Project entry updated to reflect approval of Phase 4B1, and Phase 4B2 consideration deferred to align with the anticipated availability of technology |
| AIR 5428 | 1 | Project entry updated to show First Pass Approval achieved |
| AIR 6000 | 2A/2B | Project entry rewritten to reflect revised acquisition strategy and approval of the acquisition of the first 14 aircraft |
| AIR 8000 | 1 | Phase 1 consideration deferred to better align with other capability priorities |
| AIR 9000 | Overview | Updated to reflect deletion of SCAP 2 |
| AIR 9000 | Ph 5C | Phase 5C will be considered earlier than previously planned |
| AIR 9000 | SCAP 1 | Updated to reflect deletion of SCAP 2 |
| JP 2008 | 5B | Phase 5B will be considered earlier than previously planned |
| JP 2047 | 3 | Phase 3 will be considered earlier than previously planned |
| JP 2080 | 2B.1 | Phase 2B.1 will be considered earlier than previously planned |
| JP 2089 | 3 | Project entry amended to reflect approval of Phase 2B |
| JP 2096 | 1 | Project consideration deferred |
| JP 2110 | 1B | Project entry updated to reflect approval of Phase 1A |
| LAND 17 | 1B and 1C | Project entry revised to show separate phases |
| LAND 75 | 4 | Project entry updated to reflect approval of Phase 3.4 |
| LAND 112 | 4 | Phase 4 will be considered earlier than previously planned |
| LAND 125 | 3B | Project entry updated to reflect approval of Phase 3A and Phase 3B consideration deferred because rapid acquisition has satisfied immediate requirements |
| LAND 146 | 2 | Project consideration deferred to align with anticipated availability of technology |
| SEA 1397 | 5B | Project entry updated to reflect approval of Phase 5A. |
| SEA 1442 | 4 | Phase 4 will be considered earlier than previously planned |
| Proposal Number | Phase | Description |
|---|---|---|
| AIR 9000 | SCAP 2 | Seahawk Capability Assurance Program 2 deleted due to programmed replacement of the Seahawk fleet as a matter of urgency under AIR 9000 Phase 8 |
| JP 2070 | 4 | AP-3C Light Weight Torpedo Integration deleted due to assessment that existing torpedo’s capability is adequate and the planned replacement of the AP-3C platform under AIR 7000 Phase 2B |