skip to navigation skip to content skip to footer

2025 Australian Noise Exposure Forecast Williamtown

On 10 August 2011 the Department of Defence endorsed a new Australian Noise Exposure Forecast map for RAAF Base Williamtown.  This map is designed to inform local communities and councils about aircraft noise exposure for land use planning and incorporates modelling for the F-35A Lightning II.  Further information about the operations of the F-35A Lightning II at Williamtown is available here.

Table:
RAAF Base Williamtown and Salt Ash Air Weapons Range 2025 ANEF 10 August 2011
Endorsed ANEF Map
RAAF Base Williamtown and Salt Ash Air Weapons Range 2025 ANEF Map (14mb)
INM Summary Report
RAAF Base Williamtown and Salt Ash Air Weapons Range 2025 ANEF Summary Report (including Appendix A)
Appendix B
FIG 01 Regional Location Plan

FIG 02 Runway Layout Plan
Appendix C
FIG 01 F-35A (JSF) ARR RWY 12 FIG 02 F-35A (JSF) ARR RWY 30
FIG 03 F-35A (JSF) DEP RWY 12 FIG 04 F-35A (JSF) DEP RWY 30
FIG 05 F-35A (JSF) T&G ALL RWYS FIG 06 HAWK ARR RWY 12
FIG 07 HAWK ARR RWY 30 FIG 08 HAWK DEP RWY 12
FIG 09 HAWK DEP RWY 30 FIG 10 HAWK T&G ALL RWYS Unclassified
FIG 11 PC-9 ARR RWY 12 FIG 12 PC-9 ARR RWY 30
FIG 13 PC-9 DEP RWY 12 FIG 14 PC-9 DEP RWY 30
FIG 15 PC-9 T&G ALL RWYS Unclassified FIG 16 AEW&C (B737) ARR DEP T&G RWY 12
FIG 17 AEW&C (B737) ARR DEP T&G RWY 30 FIG 18 C-130 ARR DEP RWY 12
FIG 19 C-130 ARR DEP RWY 30 FIG 20 KC-30A ARR DEP RWY 12
FIG 21 KC-30A ARR DEP RWY 30 FIG 22 CIVIL HEAVY ARR DEP RWY 12
FIG 23 CIVIL HEAVY ARR DEP RWY 30 FIG 24 CIVIL MED JET ARR DEP T&G RWY 12
FIG 25 CIVIL MED JET ARR DEP T&G RWY 30 FIG 26 CIVIL COMM ARR DEP T&G RWY 12
FIG 27 CIVIL COMM ARR DEP T&G RWY 30 FIG 28 CIVIL LIGHT ARR DEP T&G RWY 12
FIG 29 CIVIL LIGHT ARR DEP T&G RWY 30 FIG 30 BUS JET ARR DEP T&G RWY 12
FIG 31 BUS JET ARR DEP T&G RWY 30 FIG 32 HELO ARR DEP T&G RWY 12
FIG 33 HELO ARR DEP T&G RWY 30
Appendix D
Summary of Aircraft Movements
Appendix E
FIG 01 2025 ANEF (10 Aug 2011)

FIG 02 2025 ANEF (10 Aug 2011) vs 2012 ANEF FIG 02 2025 ANEF (10 Aug 2011) vs 2012 ANEF with FILL
FIG 03 2025 ANEF (10 Aug 2011) vs 2025 ANEF (23 Oct 2009) FIG 03 2025 ANEF (10 Aug 2011) vs 2025 ANEF (23 Oct 2009) with FILL
FIG 04 2025 ANEF (10 Aug 2011) vs 2025 ANEC (1 Sept 2010) FIG 04 2025 ANEF (10 Aug 2011) vs 2025 ANEC (1 Sept 2010) with FILL
Factsheets
Release of 2025 ANEF (10 Aug 2011) Environmental Impact Statement (EIS) Process